Fortress eVault + eVault MAX 18.5

Fortress eVault + eVault MAX 18.5

Notes:
Fortress <--> Sol-Ark inverter communication switched from Modbus to CAN ~Jan 2023.
Updating battery firmware across this time frame may require rewiring of the battery <--> inverter communication cable.
If continuing to run in Modbus RS485, ask for an inverter firmware update to Comm v143F, which adds communication reliability. 
If using multiple batteries, designate one as the leader and the others as followers per Fortress’ instructions. If using a single battery, skip to Step 3. 
Only Canbus instructions are supported in this workflow.

Connect all batteries using the included RJ45 cables. 
Communication cable can be made from standard ethernet cable by cutting wires 1-3, 7-8 and keeping wires 4-6.
Use the included 120 Ohm termination resistor on either end of the resulting chain. Select one of two options in the next step. 

Custom Cable
Create a custom cable connecting battery side pins 1, 2, and 3 ONLY (CAN mode) or 3, 5, and 6 ONLY (Modbus RS-485): 
If using CAN mode, Pin 1 (white-orange) should connect to Pin 4 (CAN H), Pin 2 (orange) should connect to Pin 5 (CAN L), and Pin 6 should be the same on the inverter end. 

If using Modbus mode, Pin 3 (white-green) can connect to pin 2 or pin 7 (RS485+) on the inverter end, and Pin 5 (white-blue) can be connected to either pin 1 or 8 (RS485-) on the inverter end. Connect this cable between the Fortress eVault’s CAN port (CAN mode) or RS485 port (Modbus mode) and the “Battery CANBus” port (Outdoor units) or the “CAN” (CAN mode) or “RS-485” port (Modbus mode, Indoor units). 

Update eVault MAX Firmware
Visit https://www.fortresspower.com/firmware for the latest eFlex firmware update instructions.

BMS00

Program the inverter with this battery's appropriate charge/discharge settings.
Enable “BMS Lithium Batt” and set its value to “00.”

BMS Error Stop Option

If you wish for the system to fault on the loss of battery communications, turn on “BMS_Err_Stop” 

Program Voltage Mode Batt Tab Settings 
If you cannot confirm communication, program inverter in voltage mode open loop.

Program Voltage Mode  Charge Tab Settings 
 It is acceptable to raise the grid or generator start triggers to increase the reserve capacity of the system.

Program Voltage Mode Discharge Tab Settings 
Again, only run in voltage mode / open loop settings if closed loop communication has failed.
After programing this tab, tap 'OK' and then use the 'Esc' button to go to the home screen of the inverter. Now the system is configured.

Enable Battery <--> Inverter Communication Batt Tab
a) If closed loop communication is set up correctly, enabling 'BMS Lithium Batt 00' will adjust some values automatically. In this tab, those would be 'Batt Capacity' and 'Tempco'.
b) If total charge/discharge current capacity of the batteries exceeds the inverter's capabilities, use the maximum current settings of the inverter.  For example, if you have four eVault MAX and one Sol-Ark 15K inverter, based on the size of the battery bank, 'Max A Charge' and  'Max A discharge' should be 180A each. But, Sol-Ark 15K can only carry 275A DC going to or coming from the battery. So, in this case, both 'Max A Charge' and 'Max A Discharge' would be set to 275A.

Confirm communication
If everything is configured correctly you should now see a button labeled Lithium Batt Info 
After opening this window on the SolArk you should see the following screen with real time data.
Note: While this screen is very different from the RS485 preview, but still only shows aggregate reported data from the entire battery bank

Share Monitoring With Fortress Support
Phone:  (877) 497-6937 ext. 2
After registering, use a laptop to log into MySolArk via a web browser at http://mysolark.com and share system access with support@fortresspower.com


    • Related Articles

    • Fortress BMS Communication Errors

      After years of productive battery partnership, Fortress Power has used their knowledge of our inverter products to hand over confidential lessons learned to Chinese product developer LuxPower so that LuxPower can outsource the production of a Sol-Ark ...
    • Fortress eFlex 5.4

      Notes: Fortress <--> Sol-Ark inverter communication switched from Modbus to CAN ~Jan 2023. Updating battery firmware across this time frame may require rewiring of the battery <--> inverter communication cable. Only Canbus instructions are supported ...
    • 15k.21 Generators

      Wiring to the GEN or GRID port There are two ways to interconnect a generator to a Sol-Ark: via the GRID or GEN port. The GEN port is the easiest place to land generators onto a Sol-Ark system. Wiring to the GEN port avoids the need for an automatic ...
    • Residential Basic Programming Guide

      BASIC PROGRAMMING GUIDE SYSTEM WORK MODES AND TIME OF USE FOR SINGLE INVERTER INSTALLATIONS
    • 15K.11 Installation Workflow

      Inspect Shipment Upon delivery of materials, photograph the inverter box, showing any damage or list any missing components. If damage or missing parts, immediately call +1 (972) 575-8875. Other Useful Site Photographs Transmitter Dongle Serial ...